Construction All Risks · CAR

Construction insurance for building, installation and refurbishment projects.

Cover for the works while a project is being built, refurbished or fitted out — from the first day on site to handover and the maintenance period.

The subject matter

Cover for as long as the works are being built.

While construction lasts, a project is vulnerable in a way it never will be again: half-finished structures, plant in motion, crews and subcontractors on site, and the public passing just outside it. Construction All Risks insurance covers exactly that window.

It is project-specific cover: it starts and ends with the build programme rather than running as an annual company policy. That is why it is arranged, amended and extended alongside the construction contract itself.

The structure

Two sections, one policy.

CAR normally comes in two sections. The first covers the works themselves; the second covers the damage the works can do to everyone around them.

  • Section I — Material damage to the worksThe works under construction: permanent and temporary works, materials on site, plant and site installations. Sudden and unforeseen physical damage is covered, including fire, storm, flood, theft and accidental damage during the build, subject to the terms of the policy.
  • Section II — Third-party liabilityInjury to third parties and damage to their property caused by the works: cracks in a neighbouring building from excavation or vibration, a falling object, an accident to a passer-by. Legal defence costs are included where the policy provides for them.

Where it applies

Project types and extensions.

The basic structure stays the same; what changes is which extensions genuinely make sense.

  • New build

    The classic case: a building or infrastructure project, insured from excavation to handover.

  • Refurbishment and alteration

    New works and an existing building sit side by side. The existing structure is not automatically covered: it has to be declared separately. This is one of the most frequently overlooked points on a refurbishment.

  • Fit-out

    Interior fit-out in shops, offices and hotels, often inside a building that stays open and in use, and subject to the owner’s or the building manager’s own insurance requirements.

  • Erection All Risks (E.A.R.)

    Installation and commissioning of mechanical and electrical plant. The testing period is treated separately and has to be declared up front.

  • Maintenance period

    After handover, cover can extend into the contractual maintenance or defects liability period. Scope varies considerably between policies.

  • Plant and construction equipment

    Cranes, excavators, scaffolding and tools can be covered as a separate section, on site and, depending on terms, away from it.

  • Subcontractors and co-insureds

    Employer, main contractor and subcontractors can all be named on the policy as co-insureds. It is worth agreeing who goes on it before work starts, not after a claim.

A crew working on an active construction site

The most common mistake

The sum insured is not the contract value.

It is the full cost of the completed works. Declare the contract sum instead and the project is underinsured — and the settlement follows that same proportion on every loss, however small.

It is the error we correct most often before a policy is issued.

The project ecosystem

Design, build, guarantee.

Three different covers at three stages. Construction All Risks is the middle one: it does not cover the design, and it does not replace the contractual guarantees.

  1. 01

    Design & supervision

    Liability for design, calculations and site supervision stays with the engineer and belongs under professional indemnity.

    Professional liability for engineersThe designer
  2. 02

    Construction

    The works under construction, the materials, the plant and site third-party liability. This page.

    Request an assessmentThe works
  3. 03

    Guarantee capacity

    Tender participation, performance, advance payments and maintenance are secured by surety bonds.

    Surety bondsThe contract

The three are usually arranged separately, by different people. Looking at them together before the contract is signed is what closes the gaps.

To get started

What we need in order to quote.

  • Type and description of the project
  • Total value of the works on completionNot the contract sum: the sum insured has to reflect the full cost of the completed works, otherwise a claim can be reduced for underinsurance.
  • ProgrammeCommencement date, duration and any testing or maintenance period.
  • Location and surroundingsProximity to existing buildings, roads or sensitive installations.
  • Existing property on siteFor refurbishment or fit-out, what is already there and what it is worth.
  • Contracting partiesEmployer, main contractor and subcontractors to be included.
  • Contractual insurance requirementsFrom the tender, the contract or the lender — we read them before the bid goes in.

Common questions

Worth knowing.

  • Who takes out the policy?

    Usually the employer or the main contractor, depending on what the contract requires. What matters is who is named as insured and co-insured, because that determines who can claim under it.

  • Does CAR cover the design?

    No. A claim alleging a design or calculation error falls under the engineer’s professional indemnity, which is an entirely separate policy. It is the most common misunderstanding in the sector.

  • What if the project runs late?

    Cover runs for a defined period. Extensions and variations have to be recorded on the policy in good time, because work carried out after the period of insurance ends is not covered. Tell us as soon as the programme slips.

The first conversation

Let us get the next project covered properly, from day one.

Send us the type, value and programme of the project and we will come back to you with the options.